Information about roadworks
Information on utility works (gas, electricity, water and telecoms) is mapped by one.network.
Dates of roadworks are subject to change due to factors over which we may have no control.
The dates for roadworks keep changing
Work can be delayed for a number of reasons, including:
- adverse weather
- availability of crews
- sudden emergency works elsewhere
- availability of, or problems with, machinery
The works have not started on time
The dates shown in the information pop-out on the roadworks map are often for the duration of the permit and not necessarily how long the works will take.
For example, a permit may be for 3 days when the works will only take 1 day. This is to allow for flexibility.
Work can be delayed for the reasons shown above.
Access to your drive/road during works
Access during works will depend on the type of works being carried out and on the different stages of the works.
You can speak to the team on-site to ask them if you need access at a specific time, and to find out if this is possible.
General enquiries
If you have not been able to find the information you need or want to provide feedback, contact us using our online Highways General Enquiry form.
Select the type of enquiry that you want from the list in the form, and type in the text field to tell us about your enquiry.
Page last updated: 4 December 2024